|
|
Cedar Hills increases water ratesCEDAR HILLS--City officials have approved an increase in water fees, effective June 20, based on a utility rate study by Bowen, Collins & Associates.The increases are tiered and based on whether pressurized irrigation is available. The new utility fees are assessed as follows: Water (No pressurized irrigation available) Base Rate (no usage) $8.10 Per Month (previously $7.68) 1-8,000 gallons $1.80 Per 1,000 gallons (previously $1.69) 8,001 -12,000 $1.80 Per 1,000 gallons (previously $1.69) 12,001-18,000 $1.80 Per 1,000 gallons (previously $1.69) 18,000+ $1.80 Per 1,000 gallons (previously $1.69) Water (pressurized irrigation connected) Base Rate (no usage) $8.10 Per Month (previously $7.68) 1-8,000 gallons $1.80 Per 1,000 gallons (previously $1.69) 8,001-12,000 $2.99 Per 1,000 gallons (previously $2.79) 12,001-18,000 $4.43 Per 1,000 gallons (previously $4.13) 18001+ $5.88 Per 1,000 gallons (previously $5.48) Water (pressurized irrigation not connected) Base Rate (no usage) $8.1 0 Per Month (previously $7.68) 1-8,000 gallons $2.88 Per 1,000 gallons (previously $2.70) 8,001-12,000 $4.49 Per 1,000 gallons (previously $4.19) 12,001-18,000 $5.91 Per 1,000 gallons (previously $5.51) 18001+ $7.35 Per 1,000 gallons (previously $6.85) Sewer Base Rate $13.90 Per Month (previously $13.50) Per 1,000 gal over base $4.07 (winter water usage) (previously $3.95) Storm Drain/Flood Control $10.50 Per Month (previously $9.86) The community news source for Eagle Mountain Utah, Saratoga Springs Utah, Lehi Utah, American Fork Utah, Highland Utah, Alpine Utah, and The Cedar Valley, including Cedar Fort Utah and Fairfield Utah. Copyright 2024 The Crossroads Journal LLC. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.
|
Sign in with your Facebook account
|
Sign in with your Crossroads Journal account
|